2007

The first photovoltaic systems carried out as a part of the “Solarnoproblem” campaign promoted in the territory of the province began a long-term adventure in the sector: at the beginning there was the execution of small household systems which, over a few years, led to the installation of more than 1000kWp roof-based photovoltaic “turn-key” systems. Then, in partnerships with important local companies, Selettra carried out more than 25 MW of ground-based installations.

Questo elemento è stato inserito in . Aggiungilo ai segnalibri.